Navigation Toggle Icon

Development pipeline

We aim to have a development pipeline of more than 2,000 beds per annum, creating high-quality accommodation in prime locations.

Featured property

Paddington: Our first fully net-zero carbon development

We aim to build one of the UK’s most environmentally sustainable purpose-built student accommodation properties.

Featured property

Middlesex Street, Aldgate, London

Construction work has started again on a flagship 920-bed scheme on the site of a former 1960s office block in the City of London.

Featured property

Campbell House, Bristol

A new 431-bed property on the former Bristol Royal Infirmary site which is due to open in time for the start of 2022/23 academic year.

Looking to develop sites

In the pipeline

For September 2022

We will deliver almost 1,400 beds across two developments, one in London and the other in Bristol.

For 2023 and beyond

We are buying sites in the right locations in London, Nottingham, Edinburgh, Bristol, Bath, Durham, Glasgow (west end) and others major cities to meet the increasing need for high-quality student accommodation.

Requirements

Size: Buildable development of between 80,000 sq ft gross internal area and 400,000 sq ft gross internal area.

Property type:

  • All tenures considered, but freehold and long leasehold preferred
  • Both new builds and conversions considered
  • Buildings shared with other operators and uses e.g. office or industrial
  • Within 10 minutes’ walk from transport links to university campuses

Each year, we aim to increase the number of beds available across our portfolio by 2,000 to 2,500. Our current pipeline includes sites in Edinburgh, Bristol, Nottingham and London.

Our suppliers

We work with long-standing contractor partners from the outset of each development. This ensures they are an integral part of the development team, contributing to design, risk mitigation and costing throughout the project. By taking this integrated approach, we are able to deliver accommodation schemes with market leading build costs and shorter lead-times without compromising quality.